www.simpsonanchors.com


BLUE BANGER HANGER® Cast-In-Place Internally Threaded Inserts

Inserts: Features and Installation

 
 
BLUE BANGER HANGER - METAL DECK INSERT
 

FEATURES

  • 3" plastic sleeve keeps internal threads clean.
  • Extended length of the sleeve allows easy location of the insert even with fireproofing on the underside of the deck. Also provides guidance to align threaded rod with the internal threads.
  • Installed height of 2" allows the insert to be used on top of, or between, deck ribs.
  • Compression spring keeps the insert perpendicular to the deck, even if it is bumped or stepped on after installation.
  • Multi-thread design: Each insert accepts 2-3 rod diameters.

INSTALLATION

  • Drill a hole in the metal deck using the appropriate diameter bit as referenced in the table.
  • Insert the hanger into the hole and strike the top so that the plastic sleeve is forced through the hole and expands against the bottom side of the deck. The anchor can also be installed by stepping on it.

Metal Deck Install

Metal Deck Insert Installation Sequence
Blue Banger Hanger Installation Sequence Blue Banger Hanger Installation Sequence Blue Banger Hanger Installation Sequence
 
 
BLUE BANGER HANGER - METAL ROOF DECK INSERT
go to top of page

FEATURES

  • Low profile design doesn't interfere with roofing material.
  • Plastic sleeve allows for easy identification and keeps internal threads clean.
  • Positive attachment to the roof deck prevents spinning and keeps the hanger in position.
  • Pre-staked screws allow quick installation.
  • Multi-thread design: The insert accepts 3 rod diameters.

INSTALLATION

  • Drill a hole in the metal deck using the appropriate diameter bit as referenced in the table.
  • Insert the hanger into the hole and fasten to the deck with the two pre-staked self drilling sheet metal screws provided.

Metal Roof Deck Install

Metal Roof Deck Insert Installation Sequence
Blue Banger Hanger Installation Sequence Blue Banger Hanger Installation Sequence Blue Banger Hanger Installation Sequence
 
 
BLUE BANGER HANGER - WOOD FORM INSERT
go to top of page

FEATURES

  • Blue plastic ring acts as an insert locator when forms are removed.
  • Plastic ring creates a countersunk recess to keep internal threads clean from concrete residue.
  • Nails snap off with the swipe of a hammer after the forms are removed
  • Multi-thread design: Each insert accepts 2-3 rod diameters.

INSTALLATION

  • Strike the top of the hanger and drive the 3 mounting nails into the forming material until the bottom of the hanger is flush with the plywood. The hanger should be sitting 90° perpendicular to the forming material.
  • Once concrete is hardened, and forms are stripped, strike the mounting nails to break them off.

Wood Form Installation

Wood Form Insert Installation Sequence
Blue Banger Hanger Installation Sequence Blue Banger Hanger Installation Sequence Blue Banger Hanger Installation Sequence
 
 
 
Printed from
© 2008 Simpson Strong-Tie®